Refit of a 23FT Gaff Cutter
This was our resident project during the winter of 2011 going into 2012. Her work list included stripping out cockpit and bring it back to the original, remove all deck fitting and if needed replace with bespoke bronze fittings. A new deck hatch was sourced and fitted along with a new teak deck. Engine controls and instruments were re-sited. A new galley, heads and fridge compartment was fabricated. On her hull we made fair the hull using gel coat then applied a cream white top coat and finally finished with a coat of anti-foul.